(415) 963-9693

Union Signatory Contractor, Licensed and Insured
Get A Free Estimate

Carver Elementary School

Santa Ana, CA


Size:

112,000 sq. ft.

Scope of Work:

Plumbing Detailing

Location:

Santa Ana, CA

Type of Project:

Education/Higher Education

Construction Type:

New Construction

Design Software:

AutoCAD Fabrication MEP

Client:

Pacific Plumbing Co. of Santa Ana

Year:

2019

 

Carver Elementary School in Santa Ana, CA is named after George Washington Carver. BIM Designs, Inc. completed the 3D Modeling, Spool Sheets, Seismic Layout, Trimble Point Layout for Inserts and Sleeves, Annotated and Dimensioned Shop Drawings and Installation Drawings for Fixtures for the Plumbing System.

The project includes the removal of 8 portables with construction of a new 9,900 square foot 2-story classroom building containing 8 classrooms of 960 square foot each, 4 study rooms, upper and lower floor restroom facilities along with a new 2,600 square foot lunch shelter and associated site work.

Since 1929, Pacific Plumbing Co. of Santa Ana has offered drain cleaning, process piping, water, gas pipe installation and repair, and other services as a family-owned company. According to the company's website, it offers service for both residential and commercial and operates on a 24 hour emergency service.

Previous Button
Next Button